KEYSTROKEK

Builder · 19 staff · Mackay

3 WEEKS PER TENDER. EACH ONE STARTS FROM THE LAST.

Branding and graphic design

The problem

Each tender was assembled from the previous one, in Word, over three weeks.

What we built

A tender system: structure, messaging, page templates and a library of answers the business owns.

The result

Before
21days to assemble

60 pages, from old files.

After
days

60 pages. 4 days. Won.

Tender T-03160 pages
  • Structure
  • Messaging
  • Page templates
  • Answer library
Owned by the business60 pages from one library.

An illustration of the build running, with sample data.

Every job is quoted individually after a free consultation.

Book a free consultation

Book a free consultation, or start with the quiz.

Book a free consultation