Builder · 19 staff · Mackay
3 WEEKS PER TENDER. EACH ONE STARTS FROM THE LAST.
The problem
Each tender was assembled from the previous one, in Word, over three weeks.
What we built
A tender system: structure, messaging, page templates and a library of answers the business owns.
The result
- Before
- 21days to assemble
60 pages, from old files.
- After
- days
60 pages. 4 days. Won.
- Structure
- Messaging
- Page templates
- Answer library
An illustration of the build running, with sample data.
Every job is quoted individually after a free consultation.
Book a free consultation